- Project Name: Jinan Thermal Power Group Inbound Road Overpass Project Over the Beijing-Shanghai Railway
- Project Location: Jinan City
- Project Content:
- The bridge section of the project spans from K0+075.660 to K0+264.490, and adopts a full-width design structure consisting of "30m prestressed concrete simply-supported small box girders + (85+65)m swivel steel box girders".
- The bridge deck width ranges from 22.8m to 26.237m, accommodating two-way four lanes.
- It crosses the Beijing-Shanghai Railway at mileage K507+603.51, with a crossing angle of 72 degrees, and provides a minimum vertical clearance of 8.5m beneath the bridge.
- The total steel usage for the project is 2,522 tons.



