Extra Large Truss Bridge

Extra Large Truss Bridge

The ninth section of Zouji Expressway project is located in Weishan County and Rencheng District, Jining City, Shandong Province. The project department's main line starts and ends: K32+045.3-K38+642.9, with a total length of 6.6km and the overall route is east-west. Sihe River Super Bridge...
Send Inquiry
Description
Technical Parameters

The ninth section of Zouji Expressway project is located in Weishan County and Rencheng District, Jining City, Shandong Province. The project department's main line starts and ends: K32+045.3-K38+642.9, with a total length of 6.6km and the overall route is east-west. Sihe River Super Bridge is the main line super bridge, the 35th link across the Sihe River west embankment, the upper structure adopts 105m simply supported steel girder, the whole design, the cross bridge to two main girder, girder spacing 28.5m. The transition of the substructure adopts three-column rectangular solid pier with equal section. Under each pier, four 1.6m pile foundations are connected, and the pile foundations are all bored piles. Elements of the bridge level curve: (bridge starting point, terminal pile number: K34+957.589); Mitigation curve (starting pile number: K34+957.589, ending pile number: K35+287.589, A: 978.3); Circular curve (starting pile number: K35+287.589, end pile number: K37+956.512, radius R: 2900m); Mitigation curve (starting pile number: K37+956.512, ending pile number: K38+286.512, A: 978.3); (starting pile number: K38+286.512, bridge end), parallel pier arrangement

product-2640-1978product-2640-1978

As the main line of Zou-Ji high-speed bridge, the construction of Sihe River Bridge is of great significance for improving regional infrastructure, enhancing urban image and promoting regional coordinated development. In the next step, the project department of the company will continue to uphold the enterprise mission of "making high-quality products and building high-quality projects", constantly study and overcome difficulties, continue to sum up experience, do a solid job in quality control, safety management and other work, smoothly promote the time node of the construction period, complete the project construction with quality and quantity guarantee, and provide guarantee for the smooth operation of Zouji Expressway.

Hot Tags: extra large truss bridge, China extra large truss bridge manufacturers, suppliers, factory, steel bridge strength, steel bridge design, steel bridge advertising, steel bridge height, steel bridge maintenance, steel bridge dealer