The First Lift Of The New Energy Project in Egypt Was Successfully Completed.

Aug 02, 2025 Leave a message

Recently, the first lift of the new energy project in Egypt, in which our company participated in the construction, was successfully carried out, marking the full-scale launch of the main project and laying a solid foundation for the smooth progress of the subsequent works.

news-989-1236news-1080-1348

 

The new energy project in Egypt is located in the Northwest Economic Zone of the Gulf of Suez, with a total land area of 24,820.29 square meters and a total construction area of 26,952.70 square meters. The nature of the project is an office building and industrial plant. The main structure of the building is steel structure, and the form of the steel structure is a single-story portal frame structure. The length, width and height of the building (m) are 150×150×7.325 respectively. The main span is 150m, the safety level of the structure is grade two, and the design service life of the main structure is 50 years.

 

news-1080-889Facing the construction challenges of high temperatures and strong sandstorms in Egypt, the company's team, with their superb craftsmanship and meticulous project management, accurately completed the hoisting of the first batch of steel structures, and received high praise from the partners.

 

Next, the company will continue to uphold its corporate mission of "producing high-quality products and building excellent projects", and will fully promote the high-quality execution of the project, helping it complete and go into operation as soon as possible. It will contribute the strength of Chinese steel structures to the construction of the Egyptian new energy infrastructure.
Meanwhile, the company will leverage the Egyptian project as a pivot point to deepen cooperation with global partners in the field of new energy infrastructure, making Chinese steel structures the solid framework of the "green world".